Year

, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Period

, , ,

Category

, , , , , , , ,

Topic

, , , , , , , , , , , , , , ,

Document Type

, , , , , , , , , , , , , , , , ,

Unit

, , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

Group

, , , , , , ,
Show 30 results

30 Results for:

Romain Leiglon
Farnsworth House assemblage details / Dufour Noémie Elise

Farnsworth House assemblage details / Dufour Noémie Elise

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Farnsworth House longitudinal section into axonometry of the metal structure / Ludivine Menoud

Farnsworth House longitudinal section into axonometry of the metal structure / Ludivine Menoud

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall connections / Thibaud Maillard

Crown Hall connections / Thibaud Maillard

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall frame structure / Gustave Pellier

Crown Hall frame structure / Gustave Pellier

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall structure / Thibaud Maillard

Crown Hall structure / Thibaud Maillard

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall structure connections / Romain Leiglon

Crown Hall structure connections / Romain Leiglon

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Villa Tugendhat Foundation and assembly loadbearing structure and floor / Alex Glutz

Villa Tugendhat Foundation and assembly loadbearing structure and floor / Alex Glutz

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Farnsworth House load-bearing structure/ Bannon Benjamin Rory

Farnsworth House load-bearing structure/ Bannon Benjamin Rory

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Farnsworth House metal structure/ Bannon Benjamin Rory

Farnsworth House metal structure/ Bannon Benjamin Rory

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Farnsworth House beam connections / Bannon Benjamin Rory

Farnsworth House beam connections / Bannon Benjamin Rory

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Farnsworth House / Dufour Noémie Elise

Farnsworth House / Dufour Noémie Elise

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Barcelona Pavilion overall structure

Barcelona Pavilion overall structure

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Villa Tugendhat column details / Lea Gaille

Villa Tugendhat column details / Lea Gaille

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Villa Tugendhat general structure / Lea Gaille

Villa Tugendhat general structure / Lea Gaille

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Villa Tugendhat column details / Maude Bolliger

Villa Tugendhat column details / Maude Bolliger

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Villa Tugendhat column connection detail / Maude Bolliger

Villa Tugendhat column connection detail / Maude Bolliger

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Première de couverture

Docta Manus #2

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Project

2021

Image, Document

Première de couverture

Première de couverture

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Deuxième de couverture

Deuxième de couverture

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Barcelona Pavillon column details / Maël Aymon

Barcelona Pavillon column details / Maël Aymon

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall structure connections / Clara Carmenisch

Crown Hall structure connections / Clara Carmenisch

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall structure / Clara Carmenisch

Crown Hall structure / Clara Carmenisch

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crown Hall roof beam / Kilian Schütt

Crown Hall roof beam / Kilian Schütt

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

National Gallery steel anchors / Ziad Nabil Sahlab

National Gallery steel anchors / Ziad Nabil Sahlab

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

National Gallery column details / Clara Seffacene

National Gallery column details / Clara Seffacene

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

National Gallery base details / Clara Seffacene

National Gallery base details / Clara Seffacene

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

National Gallery connection roof and column / Ziad Nabil Sahlab

National Gallery connection roof and column / Ziad Nabil Sahlab

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

National Gallery slab structure / Andréa Rakotoarinivo

National Gallery slab structure / Andréa Rakotoarinivo

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Crédits

Crédits

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Docta Manus #2

Item

2021

Image

Laboratory ALICE Techne

ALICE

Collection

2017 - 2024

14 Projects, 1 Item

Laboratory ALICE Techne

14 Projects, 1 Item

©Marina Nicollier

Making Structural Logic - ENAC WEEK 2024

ALICE, IBETON

Project

2024

Image

©Marina Nicollier

©Marina Nicollier

ALICE, IBETON

Making Structural Logic - ENAC WEEK 2024

Item

2024

Image

@EPFL

UE Agamassa Armada 2024

ALICE, IBETON

Project

2024

Image

@Léa Guillotin

PROTOTYPE PAVILION IN TEXTILE REINFORCED CONCRETE 2023

ALICE, IBETON

Project

2023

Image

Pier Luigi Netvi, Workshop Hall / Adrien Briffod

Docta Manus #4

ALICE, IBETON

Project

2023

Image, Document, Link

Barcelona Pavilion - Joëlle Luu

DOCTA MANUS #3

ALICE, IBETON

Project

2023

Image, Document

Prototype pavillon in textile reinforced concrete Publication

Prototype Pavilion in Textile Reinforced Concrete (TRC)

ALICE, IBETON, Sergio Kopinski Ekerman

Project

2023

Image

Model

Making Structural Logic – ENAC WEEK 2022

ALICE, IBETON

Project

2022

Image

Argamassa armada

UE Argamassa Armada 2021-2022

ALICE, IBETON

Project

2022

Image

Première de couverture

Docta Manus #2

ALICE, IBETON, Lechien Valentine Brigitte Patrizia,

Project

2021

Image, Document

© Ana Carvalho

Making Structural Logic – ENAC WEEK 2021

ALICE, IBETON

Project

2021

Image

Argamassa Armada

UE Argamassa Armada 2020-2021

ALICE

Project

2021

Image

Barcelona Pavillon column details / Anna Streck

Docta Manus

ALICE, IBETON, Streck Anna / Martí Triay / Florez Hernandez Liliana / Pichard Romain François /Bourdette Justine / Mudry Alexandre

Project

2020

Image, Document

Inès Branet, Studio Wegman

Crafts Year 1

ALICE

Project

2019 - 2020

Image

Journée des gymnasiens

Journée des gymnasiens

ALICE

Project

2017 - 2018

Image

Close

PROTOTYPE PAVILION IN TEXTILE REINFORCED CONCRETE 2023

ALICE

/

IBETON

Full project view

Building on the ENAC course (UE) “Argamassa Armada”, the summer workshop aims at taking the UE-research a step further into the construction of a full-scale prototype pavilion at EPFL Fribourg. The summer workshop format allows to verify the spatial and structural promises outlined by the UE-research and to build a proposition in the form of a concrete 1:1 realization (pavilion). At the basis of the research questions lies the crossing of contemporary structural research into textile reinforced concrete (TRC) and architectural work in ferrocement (Argamassa Armada) done in Brazil by the architect Lelé from ca. 1970-2000. Textile reinforced concrete allows to reiterate a building technique – ferrocement – that was highly developed in Brazil but in the last years nearly abandoned (empty factories) due to problems of corrosion. TRC (i.e. non-corrosive reinforcement) on the other hand is used nowadays for a very limited field of applications (e.g. facade elements). Its structural potential is still not fully explored and its application potential unknown to most engineers, architects and scientists in practice. The crossing of knowledge aims at exploring the full structural, architectonic and environmental dimensions of TRC. Here we see an enormous potential, as the industry by itself does not have the means to develop a structural and architectonic language, while architects and engineers do not have yet the necessary scientific knowledge to use TRC in an innovative way. It is only at the source, through exploration and testing of the technique itself, that innovation is possible. This also applies to the formwork where – after successful tests in the Semaine ENAC 2018 and 2019 – we have been working with folded metal, a material used in Brazil but not in use in the Swiss prefabrication industry.

Technical questions are in direct relation with social considerations: How can the formwork be optimised to be used serially? How can seriality incorporate variation and flexibility? Can large elements be produced with small sheet formats (i.e. a small folding machine)? What are the size-limits imposed by self-construction?

Implicit within this objective are inter-related research questions: How can advances in concrete technology be adapted for diverse climatic requirements or incorporate techniques of recycling or reuse? How can construction protocols and on-site, mini-factories be developed to minimize cost and logistical complexity so that local people take ownership of technology by means of knowledge transfer? What would be the means of diffusing this knowledge? How can this technology be adapted to various uses such as the renovation of abandoned buildings or construction on unstable terrains?

Argamassa Armada as developed by Lelé in Brazil is directly based on social innovations: manual prefabrication and building without cranes due to radical lightness of the elements as well as independency from the construction-industry were constituting factors. These aspects become even more pertinent today as the informal city is still growing; a partial auto-construction would allow inhabitants of the informal city the possibility of co-producing their own habitat. The proposed prototype pavilion in TRC aims at enlightening these aspects and sharing them with our UE-project partners in Salvador de Bahia.

Project Team 

Raffael Baur, Architect and external Lecturer, EPFL
Patricia Guaita, Architect, EPFL
Enrique Corres, Civil Engineer, PhD student, EPFL
David Fernandez-Ordonez, Civil Engineer, Host Professor, EPFL

Students

Marine Jacob, Sean Pasquier, Camyl Vigneault, François Brun, Kjetill Christinat, Julian Molliet, Cedric Frey, Laurence Boire, Maryl Barthe, Julie Devenes, Pauline Blanc, Rafael Ferreira Da Silva, Lara Freitas, Mike Lerjen, Bastien Amez, Loris Ducry, Ambre De Herde

Contact

For question write to summerchantier@epfl.ch

Team
Unit:
ALICE, IBETON
Teachers:
Raffael Baur, Enrique Corres Sojo, David Fernandez-Ordonez, Patricia Guaita
Infos
Year:
2023
Period:
Fall
Category:
Course
Topic:  
Architecture, Construction, Experimentation, Structure, Technology, Sustainability
Copyright:
CC BY Licence
Permalink
livingarchives.epfl.ch/projects/5955/prototype-pavilion-in-textile-reinforced-concrete-2023/ Close

Add or remove from collection:

Or create new collection with this item